CURRENT AND COMPLETED PROJECTS

TELFER - TSF8 Tailings dam

Client

WBHO

 

  • Design modelling.

  • Machine control design creation for multiple platforms.

WESTERN TURNER SYNCLINE 2

Client

WBHO

 

  • Design modelling.

  • Machine control design creation for multiple platforms.

  • End of month progressive measurement.

TONKIN GAP

Client

TONKIN GAP ALLIANCE

3D Siteworks scope

  • Engaged at tender stage for quantity measurement for successful bid. 

  • Works included full pavement modelling, earthworks and staging quantities.

KAREL AVENUE UPGRADE

Client

GEORGIOU

GROUP

3D Siteworks scope

  • Development of earthworks models and quantity measurement from 15% concept design through to final issue.

  • Detailed modelling of pavement layers for quantity and machine guidance purposes.

METROPOLITAN ROAD INFRASTRUCTURE ALLIANCE

Client

SURVEY

DYNAMICS

3D Siteworks scope

  • Involvement during construction phase for modelling of revised design on Murdoch drive connection.

  • Final as-constructed data collaboration into MRWA MX format for final handover for both Armadale road upgrade and Murdoch drive connection including preparation of Metadata statements.

BUNBURY OUTER RING ROAD

Client

CPB CONTRACTORS

3D Siteworks scope

  • Development of earthworks models, quantity takeoffs for associated works.

  • Mass haul optimisation for tender purposes consisting of over 500 zones, multiple borrow pits and haul road options.

ALBANY RING ROAD - TENDER WORKS

Client

BMD CONSTRUCTION

3D Siteworks scope

  • Development of earthworks models, quantity takeoffs for associated works and mass haul analysis for tender purposes.

TOM PRICE RAIL MONUMENT CONSTRUCTION

Client

CROSSLAND AND HARDY

​Project overview

  • Construction and survey of rail monuments along 50km of the Tom Price main alignments.

  • Feature survey of alignments and associated sidings etc over the 50km footprint.

  • Monuments surveyed by static GPS and double run leveling. Traverse's carried out in areas of poor satellite coverage.

3D Siteworks scope

  • Daily check and processing of field work (static, traverse and levelling)

  • Assisted with field work when required.

TRANSMISSION GULLY - NEW ZEALAND

Client

CPB CONTRACTORS

3D Siteworks scope

  • Development of conformance data spreadsheets for each alignment and pavement type for all associated alignments.

SOUTH FLANK - Mining Area C hub

Client

CPB CONTRACTORS

3D Siteworks scope

  • Development of earthworks models and quantity measurement.

  • Detailed modelling of various materials dependent on depth from natural ground surface.

  • Analysis of design slopes for landscaping treatments.

bottom of page